Bylaw

465-621-Princeton-DCC-Bylaw-Technical Appendix-R3-January 2022

What this bylaw is for

465-621-Princeton-DCC-Bylaw-Technical Appendix-R3-January 2022 is a Town of Princeton bylaw filed under Bylaws / DEVELOPMENT COST CHARGES. TOWN OF PRINCETON DEVELOPMENT COST CHARGE BYLAW No. 1015, 2022 TECHNICAL APPENDIX Town of Princeton DCC Bylaw TRUE Consulting Technical Appendix January 2022

The bylaw text

Extracted from the published PDF for reading. This is not a substitute for the official file on CivicWeb. No OCR — scanned pages may be empty.

TOWN OF PRINCETON

DEVELOPMENT COST CHARGE BYLAW No. 1015, 2022

TECHNICAL APPENDIX

January 2022 Project #465-621

Permit to Practice: 1000129

Town of Princeton DCC Bylaw TRUE Consulting Technical Appendix January 2022

Issue Log Date Issue Sept 17/2021 Town of Princeton – Draft for Municipal Review Oct 5/2021 Final – Issued for First Reading Oct 29/2021 Final – Updated as per Province of BC Comments Jan 21/2022 Final – Updated to 2022 Jan 25/2022 Final – Corrina corrected to Corina

Report Submission Report Prepared By:

Sean Curry, P. Eng. Project Engineer

R:\Clients\400-499\465\465-621\05 Reports\465-621-Princeton-DCC-Bylaw-Technical Appendix-R3-January 2022.doc

Town of Princeton DCC Bylaw TRUE Consulting Technical Appendix January 2022

TOWN OF PRINCETON

DEVELOPMENT COST CHARGE BYLAW No. 1015, 2022

TECHNICAL APPENDIX

TABLE OF CONTENTS

Pages

SECTION 1.0 INTRODUCTION AND OBJECTIVES ................................................... 1.1

SECTION 2.0 DEVELOPMENT COST CHARGE BYLAW FORMAT ........................... 2.1

2.1 Time Frame ...................................................................................................... 2.1

2.2 DCC Levy Format ............................................................................................. 2.1

2.3 Assist Factors ................................................................................................... 2.2

SECTION 3.0 DEVELOPMENT PROJECTIONS ......................................................... 3.1

3.1 Population Projections ...................................................................................... 3.3

3.1 Resulting Development Projections................................................................... 3.3

3.1.1 Residential ............................................................................................ 3.3

3.1.2 Non-Residential ..................................................................................... 3.4

SECTION 4.0 WATER SUPPLY .................................................................................. 4.1

4.1 New Infrastructure Requirements ...................................................................... 4.1

4.1.1 Distribution Network .............................................................................. 4.1

4.1.2 Water Treatment & Storage ................................................................... 4.2

4.2 Capital Cost Summary and DCC Calculation .................................................... 4.2

SECTION 5.0 SANITARY SEWER .............................................................................. 5.1

5.1 New Infrastructure Requirements ...................................................................... 5.1

5.2 Capital Cost Summary and DCC Calculation .................................................... 5.3

SECTION 6.0 MUNICIPAL ROADS ............................................................................. 6.1

6.1 Project Descriptions .......................................................................................... 6.1

6.2 Capital Cost Estimates and DCC Calculations .................................................. 6.2

SECTION 7.0 PARKS .................................................................................................. 7.1

7.1 Project Descriptions .......................................................................................... 7.1

7.2 DCC Calculations .............................................................................................. 7.1

SECTION 8.0 SUMMARY ............................................................................................ 8.1

Appendix A – Plan of DCC Projects Appendix B – Development Cost Charge Project Capital Cost Estimates Water Supply • Brooks Booster Station Replacement • New Well at Water Supply Well No. 4 Site • Industrial Area Watermain Upgrading Sanitary Sewer • Relining of Fenchurch Forcemain • Culbertson Lift Station Replacement • Sanitary Sewer Trunk Main Upgrading • Fenchurch Lift Station Electrical Upgrades Roads • Corina Avenue Widening (School to Lapworth) • Jacobson Road Reconstruction (Old Merritt Highway to Watermain R/W) • Granby Way Widening (Barr to Stout) • Laurie Currie Way Surfacing (Highway 5A to Prin ceton-Summerland

Town of Princeton DCC Bylaw TRUE Consulting Technical Appendix January 2022

Road) • Airport Road Widening (Old Merritt Highway to Town Boundary) Parks • Trail - Swan Lake to Airport Trail Interconnection (700m length) • Trail - Jacobson Road to Airport Trail Interconnection (500m length) • Public Washroom near Dog Park

Source Reports: Associated Engineering. Town of Princeton Wastewater System Evaluation, <May 1995> EcoPlan International. Regional District of Okanagan-Similkameen Housing Needs Assessment Report, <March 2021> Golder Associates Ltd. Groundwater Management Strategy Princeton, BC, <August 8, 2007> LEE+ Associates. Town of Princeton Parks and Recreation Strategic Plan, <November 2013> Ministry of Community Services. Development Cost Charge Best Practices Guide. 3rd Edition, <2005> Town of Princeton. Official Community Plan Bylaw 808, <September 15, 2008> Town of Princeton. Subdivision & Development Servicing Bylaw 649, <1994> Town of Princeton. Zoning Bylaw 880, <2013> TRUE Consulting. Town of Princeton 2020 Annual Wastewater Treatment Plant, <March 2020> TRUE Consulting. Town of Princeton Asset Management Plan, <June 2019> TRUE Consulting. Town of Princeton Brooks Booster Station Replacement Predesign Report, <June 2015> TRUE Consulting. Town of Princeton North Princeton Servicing Feasibility Study, <July 2019> TRUE Consulting. Town of Princeton Sanitary Sewer Collection System Capacity Evaluation, <December 2010> TRUE Consulting. Town of Princeton Water Conservation Plan, <January 2020> TRUE Consulting. Town of Princeton Water System Capacity Analysis, <February 2012> Urbanics Consultants Ltd. Town of Princeton Housing Needs Report, <April 2020>

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 1.1 - January 2022

SECTION 1.0 INTRODUCTION AND OBJECTIVES

Development cost charges (DCCs) are not currently levied by the Town of Princeton (the Town). As such, The Town is proceeding with a process to adopt a new DCC bylaw. The objectives for the new DCC bylaw are DCC’s applicable to all catego ries of devel opment including non - residential, D CC’s for all infrastructure categories owned and operated by the Town and full compliance with applicable Provincial guidelines. This technical appendix is a supporting document to the Town’s new DCC Bylaw No . 1015,

2022. This technical appendix provides i nformation on all DCC capital proj ects and details the

calculation methodology for DCC’s for each infrastructure category. This technical appendix follows the recommendations of the Best Practices Guide (3rd edition, dated 2005) as closely as possible.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 2.1 - January 2022

SECTION 2.0 DEVELOPMENT COST CHARGE

BYLAW FORMAT

2.1 Time Frame

The Best Pr actices Guide (BPG) describes two options for program time frame that may be used as the basis for determining capital project requirements which then leads to the derivation of DCCs. One option is described as a build out approach where a capital plan is used to define all necessary projects to service dev elopment anticipated to occur to the full extent and level defined by the current Official Community Plan (OCP). For the Town, the build out approach to the derivat ion of DCCs represents the fol lowing difficulties and complications:  uncertainty of assistance programs from senior levels of government for road, water supply and sanitary sewer capital projects.  changes by senior government to the regulatory standards for water supply, wastewater treatment and disposal, etc.  preparation of capital cost estimates for projects that may be constructed 15 to 25 years in the future is, at the best of times, extremely difficult. The second time frame option described as being acceptable in the BPG is the revolving program approach. The revolving program consists of on ly those capital projects which are necessary to service development that is expected to occur in a defined or specified time frame, i.e., a 5- or 10- year period. As co mpared to the build out approach, it is significantly more straightforward with the revolving program to derive a realistic design population for the DCC calculations. It is also more straightforward to accurately describe capital works requirements and cost estimates for a 5 -to-10-year design population than a 25 year or longer time horizon. Uncertainty f actors related to technology, and senior government policies and standards, become less of a concern with the shorter time horizon. In consultation wi th the Town, the revolving pro gram approach is the preferred option for the derivation of DCCs. A 10-year projection time frame has been utilized for the revolving program approach with population and development projections derived from various reputable sources.

2.2 DCC Levy Format

The Best Pr actices Guide recommends that DCC’s should be establ ished on a municipal -wide basis unless there is a significant disparity between those who pay and the benefiting users. A municipal-wide charge means that the same DCC rate is applied for a part icular lan d use

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 2.2 - January 2022

throughout the municipality regardless of the specific location and benefiting area of a capital project. The BPG presents the following as potential advantages of the municipal-wide approach:  the complexity and co sts of administration associated wit h numerous Sector area charges is eliminated.  municipal-wide charges “keep it short and simple” and thereby reduces confusion.  there is no inequity in development potential between different areas of the municipality.  even in the Sector approach there is some “averaging” in the derivation of charges. Wherever practical, the BPG suggests that municipal-wide approaches be utilized. Consistent with the BPG, a municipal-wide format is used for the DCC Bylaw. All capital projects included in the DCC bylaw equally benefit from new development in all sectors of the Town.

2.3 Assist Factors

Section 933(2) of the Local Government Act states that the purpose of DCCs is to provide funds

to ‘ assist’ local government to provide and improve parks and construct i nfrastructure. Accordingly, there is a requirement for municipalities to provide an assist factor in the derivation of DCCs. The assist factor:  may be set as low as 1%.  generally, reflects Council’s desire to encourage development and is therefore largely a political decision.  may be varied from time-to-time by Bylaw amendment to ensure that DCCs do not deter development.  may vary by components, for example 5% for sewers, 10% for roads, 25% for parks, etc. With the technical appendi x, the BPG requires that the assist factor and resultant assistance amount be clearly shown. An assist factor of 1% has been used in this Technical Appendix. It should be noted that the assist factor is, for each infrastructure category, applied to the gro ss DCC recoverable amount before subtraction of the current DCC account balance. This m ethod of calculation is in accordance with guidance from the Ministry of Community, Sport and Cultural Development.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 3.1 - January 2022

SECTION 3.0 DEVELOPMENT PROJECTIONS

3.1 Population Projections

Consistent with the revolving program approach described in Section 2.0, the DCC calculations are derived on the basis of a 10- year population projection. Historical population data from Statistics Canada for the Town is present ed in Table 3.1. The 5-year average growth between data sets has ranged from 1.8% to 3.8% between 2001 and 2016. In comparison, the Regional District of Okanagan-Similkameen (RDOS) saw the growth between data sets for the same time periods ranging from -3.3% to 3.7%, while for British Columbia it was 5.3% to 7.0% (see Table 3.2). The census population data was derived from the short-form Census as opposed to the long-form census, which i s collected from a 25% sample of the population. The RDOS Housing Needs Assessment Report (2021) and the Town of Princeton Housing Needs Report (2020) used the long-form census data which provides more housing related data, however, is less accurate in terms of population figures. In terms of annual aver age population growth rates between 2001 and 2016, the Town experienced an average growth rate of 0.56% annually over the 15- year period, as did RDOS, while the province saw a 1.26% increase in growth. When looking at annual average population growth rates over a 5-year period (2011 to 2016) one can see that the Town experienced a slightly higher growth rate of 0.76%, compared to RDOS at 0.56%, whereas the whole of British Columbia was 1.13%.

TABLE 3.1: TOWN OF PRINCETON - RECENT HISTORICAL POPULATION GROWTH

YEAR CENSUS POPULATION WITHIN

MUNICIPAL BOUNDARY

5-YEAR AVERAGE

POPULATION GROWTH RATE

*2001 2,610 - *2006 2,677 2.6% *2011 2,724 1.8% *2016 2,828 3.8% *Source: Statistics Canada – Short-Form Census

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 3.2 - January 2022

TABLE 3.2: RDOS AND BRITISH COLUMBIA - RECENT HISTORICAL POPULATION GROWTH

YEAR

RDOS BRITISH COLUMBIA

CENSUS POPULATION

WITHIN MUNICIPAL

BOUNDARY1

5-YEAR AVERAGE

POPULATION

GROWTH RATE

CENSUS POPULATION

WITHIN MUNICIPAL

BOUNDARY1

5-YEAR AVERAGE

POPULATION

GROWTH RATE

*2001 76,635 - 3,907,738 - *2006 79,475 3.7% 4,113,487 5.3% *2011 80,742 -3.3% 4,400,057 7.0% *2016 83,022 2.8% 4,648,055 5.6% *Source: Statistics Canada – Short-Form Census

British Columbia Regional District and Municipal population estimates suggest that the annual average growth rate for Princeton between 2016 -2020 will range from - 2.0% to 3.6%, whereas the annual average growth rate for RDOS will range from 0.8% to 1.7%.

TABLE 3.3: BC STATS HISTORICAL DATA

YEAR POP. ESTIMATES

PRINCETON*

ANNUAL AVG.

POP. GROWTH

RATE

POP. ESTIMATES

RDOS*

ANNUAL AVG.

POP. GROWTH

RATE

2016 2,947 - 85,829 -

2017 2,887 -2.0% 86,943 1.3%

2018 2,954 2.3% 88,443 1.7%

2019 3,000 1.6% 89,344 1.0%

2020 3,108 3.6% 90,057 0.8%

*Source: BC Stats – February 2021

While BC Stats shows the Regional District with a relatively stable rate of growth between 2016- 2020, the sa me doesn’t hold true for Princeton which shows some notable swings in growth during the same period. This could be attributed to fluct uations in th e mining and forestry industry. Recognizing that there is no current DCC Bylaw in which to reference projected growth rates, nor are population projections included in the Official Community Plan (2008) , additional data should be considered to further assist in determining an appropriate gr owth rate for the Town . As such , projected growth rates from the Princeton Housing Needs Report (2020) and the RDOS Housing Assessment Report (2021) are included below.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 3.3 - January 2022

TABLE 3.4: TOWN OF PRINCETON - RECENT HOUSING STUDY GROWTH PROJECTIONS

YEAR RDOS HOUSING

ASSESSMENT (2021)

5-YR AVERAGE

GROWTH RATE

PRINCETON HOUSING

REPORT (2020)

5-YR AVERAGE

GROWTH RATE

*2006 2,605 - 2,605 - *2011 2,660 2.1% 2,660 2.1% *2016 2,760 3.8% 2,760 3.8% 2021

2,889 4.7% 2,841 2.9%

2026 2,986 3.4% 2,924

2.9% *Source: Statistics Canada – Long-Form Census

The RDOS assessment shows a 4.7% projected 5-year average growth rate for the To wn between 2016-2021 and 3.4% between 2021-2026, as shown in Table 1.4 above. This results in an average annual growth rate 0.93% and 0.67% respectively during those periods. Whereas the Princeton housing report projects a 5 -year average growth rate of 2.9% for the same two periods, resulting in an average annual growth rate of 0.59%. To determine projected populations and development DCC-eligible projects, a conser vative growth rate of 0.72% has been used for population projections within the Town for the next 10 years, as show in Table 3.5 below.

TABLE 3.5: TOWN OF PRINCETON – 10-YR GROWTH PROJECTIONS

BASED ON 0.72% GROWTH RATE TOTAL POPULATION POPULATION INCREASE

Base Population (2016) 2,828 - Projected Population (2021) 2,932 104 Projected Population (2026) 3,039 211 Growth to 2031 3,150 322

3.1 Resulting Development Projections

3.1.1 Residential

From Section 2.0 , a 10 -year build out timeframe is used for t he DCC calculation. As noted earlier, in the absence of population projections in the current OCP, population projections were derived from Statistics Canada census profile data. The anticipated build out population to 2031 within the Town boundaries is est imated to be 3150 representing an increase in population of 218 between 2021-2031. As compar ed to the projected population of 2 ,932 (2021), the build out population of 3, 150 represents an increase of 218 over the 10-year build out period.

2016 Census popul ation distribution data indicates that the average household size is 2.0

people per unit. Recognizing that the average household size varies depending on the housing type, low density residential will be set at 2.1 persons per unit, medium density at 2.0 persons per unit and high densi ty at 1.5 persons per unit. Based on a review of the historica l household

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 3.4 - January 2022

and dwelling characteristics (Stats Can), new residential development to the build out population of 218 is assumed to comprise: Low Density Residential 83% 86 units @ 2.1/unit = 180 Medium Density Residential 7% 8 units @ 2.0/unit = 16 High Density Residential 10% 15 units @ 1.5/unit = 22 Total 100% 109 units = 218

3.1.2 Non-Residential

The BPG requires development projections of non-residential land uses i ncluding commercial, industrial, and institutional. Typically, projections of non-residential land uses are based on an assessment of historical building permit data. For small munici palities such as P rinceton, building permit data can lead to erroneous projections recognizing:  One or two permits fo r a large industri al or commercial building are better classified as anomalies rather than being indicative of the rate of new development.  Lack of consistent reporting of building permits.  Often building permits do not differentiate between new constructi on, renovations, or replacement. In the absence of building permits reports, l and utilization data included in the Town’s Princeton Housing Needs Rep ort (2020) was used to show exist ing split between commercial, industrial and institutional uses within the Town.

TABLE 3.6: NON-RESIDENTIAL LAND UTILIZATION

Non-Residential Use Based on Ha Based on Parcels Commercial 34% 41% Industrial 52% 50% Institutional 14% 9%

Non-residential la nd use development ratios developed from building permit data from other small Central Interior municipalities are summarized below: Clearwater 20,000 m2 / 1,000 population increase Sicamous 25,000 m2 / 1,000 population increase Oliver 27,200 m2 / 1,000 population increase Osoyoos 30,000 m2 / 1,000 population increase Taking into consideration the above information, an appropriate ratio to apply to non- residential land use in Princeton for DCC bylaw purposes is 25,000 m² per 1,000 population growth. Based

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 3.5 - January 2022

on a reasonable mix of commerci al, industrial and institutional uses, the estimated new non- residential development for a 3,150 build out population will comprise:

TABLE 3.7: NON-RESIDENTIAL DEVELOPMENT PROJECTIONS

Land Use Percentage of non- residential development Estimated New Development (m² Gross Floor Area) Commercial 55% 2,998 Institutional 35% 1,907 Industrial 10% 545 Total 5,450

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 4.1 - January 2022

SECTION 4.0 WATER SUPPLY

4.1 New Infrastructure Requirements

In accordance wi th the various referenced infrastructure studies and in consultation with Town staff, the following water supply projects are planned to be constructed in the next 10 years.

4.1.1 Distribution Network

The wat er distribution network projects listed below ar e required to provide a higher level of service in the next 10 years to ac commodate 2,932 in existing population and 218 in new development. Therefore, DCCs should collect 218/3,150 (6.9%) of these project costs. Design Population 3,150 New Development (10 year) 218 Benefit to Population in DCC Horizon 6.9% Project W1: Brooks Booster Station Replacement The Brooks Booster Station is currently running at capacity. D uring summer months, both pumps in the booster station regularly run for twen ty hours per d ay each – with no standby capacity. Furthermore, the Brooks Booster pumps and electrical components are housed in a poorly accessible, below grade chamber which presents challenges due to confi ned space issues. Replacement of this booster station is neces sary to accommodate additional demands throughout pressure zone 770 as identified in the Town ’s Brooks Booster Station Replacement Predesign Report (June 2015). This project has an estimated cost of $760,000. Project W3: Industrial Area Watermain Upgrading The Town’s Water System Capacity Analysis (February 2012) includes a looped water main from the existing industrial area back to the Airfield Reservoir to address fire flow deficiencies in the area. Based on the conceptual alignment in the Water System Cap acity Analysis, approximately 1,400m of 300mm watermain will be installed. This project has an estimated cost of $980,000.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 4.2 - January 2022

4.1.2 Water Treatment & Storage

Project W2: New Well at Water Supply Well No. 4 Site The Town’s Water System Capacity Analysis (Febr uary 2012) noted that the current water supply wells (#1, 2, and 4) appear to have adequate capacity to sustain population growth to approximately 3,200 people. Recent analysis of this water supply indicates that the groundwater wells are experiencing capacity degradation issues and may not mee t demand requirements by 2023. Based on recommendations from the T own’s Groundwater Management Strategy (August 2007), a new well with a sustainable y ield of about 45 L /s has been proposed for the water system. Thi s additional capacity would provide service for an addit ional design population of about 1,500 based on a cu rrent per capita Maximum Day Demand (MDD) of about 2,600 l pcd as per the Town’s Water Conservation Plan (January 2020). Therefore, this water supply project would be expected to be adequate to a population projection of about 4, 500. Please note that this population projection does not account for a future decrease in well capacities. This project has an es timated cost of $762 ,000. 100% of the costs related to his project are to be collected from DCCs a s th is project has been initiated to serve the projected population growth. The project has a design population of 4,500 to accommodate future grow th of about 1,500 and the existing population of 2,932. DCC s should collect 218 /1,500 (14.5%) of this project cost. New Growth included in Design Population 1,500 New Development (10 year) 218 Benefit to Population in DCC Horizon 14.5%

4.2 Capital Cost Summary and DCC Calculation

The calculation for net amount recoverable by DCC funding for the wat er supply projects i s summarized in Table 4 .1. The calculation uses the benefit factors described in Section 4 .1 to determine the ‘Benefit to New Development’ for each projec t, the total of which is the DCC Recoverable Cost. Prior to calculating the result ing DCCs, the DCC Re coverable Cost is decreased by the Municipal Assist Factor (1%). There is no applicable grant funding for these projects to be subtracted from the DCC Rec overable Cost. Also, as the Town does not curren tly levy DCCs , existing DCC Reserves are not considered.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 4.3 - January 2022

TABLE 4.1: WATER SUPPLY PROJECTS

WATER SUPPLY PROJECT

TOTAL

ESTIMATED

COST

PERCENT

DCC

RECOVERABLE

TOWN-

FUNDED

DCC

RECOVERABLE

Project W1: Brooks Booster Station Replacement $760,000 6.9% $707,560 $52,440 Project W2: New Well at Water Supply Well No. 4 Site $762,000 14.5% $651,510 $110,490 Project W3: Industrial Area Watermain Upgrading $980,000 6.9% $912,380 $67,620 Total $230,550 Municipal Assist Factor (subtract) 1% DCC Recoverable Costs $228,245 Project growth; residential, commercial, institutional, and industrial; within the DCC horizon is presented in Section 3.0. Consisten t with the BPG, a n equivalent population calculation for growth from which DCC’s will be charged is presented in Ta ble 4.2 on which basis DCC’s are derived for each land use category. Population equivalencies per square meter of gross floor area (GFA) of non-residential development are derived from the BPG.

TABLE 4.2: WATER SUPPLY DCC CALCULATION

Part A – Equivalent Population

Land Use Est. New Development Equivalent Population Total Equivalent Population Low Density 86 units 2.1 180 Medium Density 8 units 2.0 16 High Density 15 units 1.5 22 Commercial 2,998 m² GFA 0.013 39 Industrial 1,907 m² GFA 0.005 10 Institutional 545 m² GFA 0.011 6 Total Equivalent Population 273

Part B – Unit per equivalent population DCC

Water Supply DCC Program Recoverable (from Table 4.1) $228,245 (divided by) Total Equivalent Population 273 DCC per equivalent person $836

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 4.4 - January 2022

Part C – Resulting Water Supply DCC’s

Low Density Residential $836 x 2.1 $1,756 per unit Medium Density Residential $836 x 2.0 $1,672 per unit High Density Residential $836 x 1.5 $1,254 per unit Commercial $836 x 0.013 $10.87 per m² GFA Industrial $836 x 0.005 $4.18 per m² GFA Institutional $836 x 0.011 $9.20 per m² GFA

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 5.1 - January 2022

SECTION 5.0 SANITARY SEWER

5.1 New Infrastructure Requirem ents

In accordance with the various referenced infrastructure studies and in consultation with Town staff, the following sanitary sewer projects are planned to be constructed in the next 10 years. Project S1: Relining of Fenchurch Forcemain The Fenchurch lift station and the associated, older cast iron forcemain were installed in 1960 to pump most of the Town’s municipal wastewater from the downtown c ore to the wastewater treatment facility. A forcemain break occurred in the early 90’s which released untreat ed sewage into the Similkameen River. This break resulted in the Memorial Park wells (located immediately downstr eam of the forcemain river crossing) becoming contaminated. It i s understood that the Town was then forced to shut down the water supply at thi s location after members of the community experienced adverse health issues. Therefore, this forcemain break resulted in interruptions to water and sewer service for the communi ty and also negatively impacted the surrounding environment. Following this ev ent, the T own immediately began planning for the construction of a new forcemain from the Fenchurch lift station. This new forcemain (constructed o f high- density polyethylene) w as commissioned in 1996 and was m eant to act in parallel with the older forcemain during periods of peak usage. Unfortunately, public works rec ords indicate that this preferred operational set-up (i.e., parallel forcemains operating during periods of peak flow) was not acted upon and the older forcemain has been inactive since 1996. The existing lift station and HDPE forcemain are currently at capacity. The Town has also taken the following actions to determine whether the older cast iron forcemain c ould be brought back into service, thereby increasing the capacity of the system.  CCTV inspection of the existing pipeline.  Two sections of the cast iron forcemain were removed and sent to a materials laboratory to conduct a condition assessment  Repair the sections of main that were removed and then conduct a pressure test. The results of t he above have indicated that the existing pipeline cannot be brou ght back into service. As such , it was recommende d that the Town proceed wit h a Cu red in Place Pipe (CIPP) liner installation if this option is found to be viable. Consideration of a different trenchless technology such as pipe bursting or slip- lining of a new pipe within existing cast iron forcemain may also be warranted.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 5.2 - January 2022

This project has an estimated cost of $725 ,000. 100% of the costs related to his project are to be collected from DCCs as this project will be initiated to serve the projected population growth. From the Town’s North Princeton Servicing Feasibility Study (July 2019) , this project has a design popul ation of 3,648 to accommodate future grow th of about 716 and the existing population of 2,932. DCCs should collect 218/716 (30.4%) of this project cost. New Growth included in Design Population 716 New Development (10 year) 218 Benefit to Population in DCC Horizon 30.4% Project S2: Culbertson Lift Station Replacement The Culbertson Lift Station is currently running at capacity and has been identified as a priority replacement project in the T own’s Asset Management Plan (June 2019). Furthermore, the Culbertson Lift Station submersible pumps are hou sed in a poorly accessible, below gr ade chamber with no lift out allowances . This confi guration presents significant operational challenges due to co nfined space issues. Replacement of this lift station is necess ary to accommodate additional demands throughout the collection area. This project has an estimated cost of $685,000. The project is required to provide a higher level of service in the next 1 0 years to accommodate 2,932 in existing population and 218 in new development. Therefore, DCCs should collect 218/3,150 (6.9%) of these project costs. Design Population 3,150 New Development (10 year) 218 Benefit to Population in DCC Horizon 6.9% Project S3: Sanitary Sewer Trunk Main Upgrading The existing trunk main to the North Princeton area is undersized and will limit service capacity in this area. Correction of these capacity issues is not a modest issue and would likely involve a general sewer collection system asset replacement program. A suggested strategy from the Town’ s North Princeton Servicing Feasibility Study (July 2019) and Sanitary Sewer Collection System Capacity Evaluation (December 2010 ) to allow development to proceed prior to correcti on of all deficient gravity sew er piping would be to replace three existing sections of gravity piping considered most deficient from a capaci ty perspective. These t hree sections of deficient sewer main ar e located on Riverside R oad, Poplar Street and Lime Street. This project has an overall estimated cost of $608,000. 100% of the costs related to t his project are to be collected from DCCs a s t his project has been initiated to serve the projected population growth. The project has a design population of 3,244 to accommodate future growth

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 5.3 - January 2022

of about 312 and the existing population of 2,932. DCCs should collect 218/312 (70%) of this project cost. New Growth included in Design Population 312 New Development (10 year) 218 Benefit to Population in DCC Horizon 70% Project S4: Fenchurch Lift Station Electrical Upgrades In conjunction with Project S1 this project is meant to i ncrease the pumping capacity of the existing pumping station. This project involves replacement of the existing pumps with larger capacity ones and vari ous electrical syste m upgrades to both accommodate these upgrades and also ensure that the new electrical upgrades are housed in an explosion proof manner. Centrix Control Solutions has estimated cost of the cost of this project as $337,400 – although this cost does not include upgrading of the electrical service, trenching, backfilling, and concrete pads. With this in mind this project has an overall estimated cost of $411,000. 100% of the costs related to his project are to be collected from DCCs as this project will be initiated to serve the projected population growth. From the Town’ s North Princeton Servicing Feasibility Study (July 2019) this project has a design population of 3,648 to accommodate future growth of about 716 and the existing population of 2,932. DCCs should collect 218/716 (30.4%) of this project cost. New Growth included in Design Population 716 New Development (10 year) 218 Benefit to Population in DCC Horizon 30.4%

5.2 Capital Cost Summary and DCC Calculation

The calculation for net amount recoverable by DCC funding for the sanitary sewer projects is summarized in Table 5 .1. The calculation uses the benefit factors described in Section 5 .1 to determine the ‘Benefit to New Development’ for each project, the total of which is the DCC Recoverable Cost. Prior to calculating the resulti ng DCCs, the DCC Recoverable C ost is decreased by the Municipal Assist Factor (1%). There is no applicable grant funding for these projects to b e subtracted from the DCC Recoverable Cost. Also, as the Town does not currently l evy DCCs, existing DCC Reserves are not considered.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 5.4 - January 2022

TABLE 5.1: SANITARY SEWER PROJECTS

SANITARY SEWER PROJECT

TOTAL

ESTIMATED

COST

PERCENT

DCC

RECOVERABLE

TOWN-

FUNDED

DCC

RECOVERABLE

Project S1: Relining of Fenchurch Forcemain $725,000 30.4% $504,600 $220,400 Project S2: Culbertson Lift Station Replacement $685,000 6.9% $637,735 $47,265 Project S3: Sanitary Sewer Trunk Main Upgrading $608,000 70.0% $182,400 $425,600 Project S4: Fenchurch Lift Station Electrical Upgrades $411,000 30.4% $286,056 $124,944 Total $818,209 Municipal Assist Factor (subtract) 1% DCC Recoverable Costs $810,027 Project growth; resident ial, commercial, institutional, and industrial; within the D CC horizon is presented in Section 3.0. Consiste nt with the BPG, a n equivalent population calculation for growth from which DCC’s will be charged is presented in Table 4.2 on which basis DCC’s are derived for each land use category. Population equivalencies per square meter of gross floor area (GFA) of non-residential development are derived from the BPG.

TABLE 5.2: SANITARY SEWER DCC CALCULATION

Part A – Equivalent Population

Land Use Est. New Development Equivalent Population Total Equivalent Population Low Density 86 units 2.1 180 Medium Density 8 units 2.0 16 High Density 15 units 1.5 22 Commercial 2,998 m² GFA 0.013 39 Industrial 1,907 m² GFA 0.005 10 Institutional 545 m² GFA 0.011 6 Total Equivalent Population 273

Part B – Unit per equivalent population DCC

Sanitary Sewer DCC Program Recoverable (from Table 5.1) $810,027 (divided by) Total Equivalent Population 273 DCC per equivalent person $2,967

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 5.5 - January 2022

Part C – Resulting Sanitary Sewer DCC’s

Low Density Residential $2,967 x 2.1 $6,231 per unit Medium Density Residential $2,967 x 2.0 $5,934 per unit High Density Residential $2,967 x 1.5 $4,451 per unit Commercial $2,967 x 0.013 $38.57 per m² GFA Industrial $2,967 x 0.005 $14.84 per m² GFA Institutional $2,967 x 0.011 $32.64 per m² GFA

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 6.1 - January 2022

SECTION 6.0 MUNICIPAL ROADS

6.1 Project Descriptions

Municipal road projects considered necessary t o the DCC population of 3,150 have been identified on the basis of the Town’s Roadworks Capital Plan (February 2011), input and comment from Town administration staff, and “Transportation” objectives of the OCP listed following.  Create an accessible environment where people of all ages, using a variety of transportation modes (including walking, cycl ing, motorized scooters, wheelchairs), can move with ease.  Promote the use of multiple modes of alternative transportation ( i.e., pedestrians, bicycles, scooters, and wheelchairs) within the community.  Consider the needs of pedestrians and cyclists using the road network and where possible provide opportunities to enhance safety of these users. Municipal road projects for the purpose of DCC calculation are illustrated in Appendix A and are summarized by objectives as follows:  Collector Road Surfacing o Project R4: Laurie Currie Way Surfacing (Highway 5A to Princeton-Summerland Road) $858,000

 Local Road Surfacing/Upgrading o Project R2: Jacobson Road Reconstruction (Old Merritt Highway to Watermain R/W). Presently, the road is not constructed to an ur ban standard and is in poor condition, with a gravel surface, no sidewalks, drainage facilities, nor street lighting. The Town has identified this road as the init ial phase of a future key community access route, consistent with the OCP. It is expected that new development would be responsible for the second phase of this project. $897,000

 Local Road Upgrading to provide Sidew alks Linkages between Neighbourhoods . These two roads have been identified by the To wn as key neighborhood linkages w hich presently do not include facilities for pedestrians or bicycles. As such these roads would be widened to include sidewalks complete with adequate drainage facilities. o Project R1: Corina Avenue Widening (School to Lapworth) $740,000 o Project R3: Granby Way Widening (Barr to Stout) $260,000

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 6.2 - January 2022

6.2 Capital Cost Estimates and DCC Calculations

Capital cost es timates f or all road projects in S ection 6.1 are presented in Ap pendix B and summarized in Table 6.1. With the exception of the Airport Road widening project, from the Old Merritt Highway to the Town B oundary, all projects are considered of general benefit with costs apportioned both to the existing population and new development. Table 6.1: DCC Recoverable Costs for Municipal Roads

MUNICIPAL ROADS PROJECT

TOTAL

ESTIMATED

COST

PERCENT

DCC

RECOVERABLE

TOWN-

FUNDED

DCC

RECOVERABLE

Project R1: Corina Avenue Widening (School to Lapworth) $740,000 6.9% $688,940 $51,060 Project R2: Jacobson Road Reconstruction (Old Merritt Highway to Watermain R/W) $897,000 6.9% $835,107 $61,893 Project R3: Granby Way Widening (Barr to Stout) $260,000 6.9% $242,060 $17,940 Project R4: Laurie Currie Way Surfacing (Highway 5A to Princeton-Summerland Road) $858,000 6.9% $798,798 $59,202 Total $190,095 Municipal Assist Factor (subtract) 1% DCC Recoverable Costs $188,194 The Development Cost Charge Best Practices guide suggests calculation of DCC’s on the basis of afternoon (PM) peak hour tr ip generation for each land use as contained in the Insti tute of Transportation Engineers (ITE) manual titled “Trip Generation”. Utilizing this approach, the Best Practices Guide provides the fol lowing peak afternoon trip generation criteria for DCC apportionment by land use. The guide values have been reduced by 50% for non-residential land uses on the basis that the lower values are more representative of commercial and industrial uses in small municipalities in the central BC Interior area.  low density residential 1.02/unit  medium density residential 0.66/unit  high density residential 0.62/unit  commercial 0.007/m² of gross floor area  industrial 0.0022/m² of gross floor area  institutional 0.009/m² of gross floor area Applying these trip generation criteria to estimated new development as presented in Section 3.0 results in the following trip end totals by land use category.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 6.3 - January 2022

Table 6.2: Municipal Roads DCC Calculation

Part A – Trip Ends

Land Use Est. New Development Trip Generation Total Trip Ends Low Density 86 units 1.02 88 Medium Density 8 units 0.66 5 High Density 15 units 0.62 9 Commercial 2,998 m² GFA 0.007 21 Industrial 1,907 m² GFA 0.0022 4 Institutional 545 m² GFA 0.009 5 Total Trip Ends 132.4

Part B – Unit DCC Calculation

Municipal Roads DCC Program Recoverable (from Table 6.1) $188,194 (divided by) Total Trip Ends 132.4 DCC Per Trip End $1,421

Part C – Resulting Municipal Roads DCC’s

Low Density Residential $1,421 x 1.02 $1,450 per unit Medium Density Residential $1,421 x 0.66 $938 per unit High Density Residential $1,421 x 0.62 $881 per unit Commercial $1,421 x 0.007 $9.95 per m² GFA Industrial $1,421 x 0.0022 $3.13 per m² GFA Institutional $1,421 x 0.009 $12.79 per m² GFA

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 7.1 - January 2022

SECTION 7.0 PARKS

7.1 Project Descripti ons

The Town of Princeton has historically required devel opers to contribute 5.0% of the predevelopment appraised land val ue in lieu of dedication of parkland. Furter details are in the Town’s OCP and the Parks and Recreation Strategic Plan (November 2013). The Town intends to continue this requirement therefore parkland acquisition is not a component of the Parks DCC. Consistent with the pedestrian access objectives as described here in Section 6.0 and the Parks and Trails in Secti on 4.1.7 of the OCP, two trail construction projects as illustrated in Appendix A and described following are planned. • Construction of a pat hway meant to connect the Swan Lake trail system to the Airport trail system. The trail length is approximately 700m (Project P1). • Construction of a pathway meant to connect the Jacobson Road area to the Airport trail system. The trail length is approximately 500m (Project P2). In addition to the above trail projects, construction of a public washroom facility within the Town boundary is planned (Project P3). This project location is currently planned in the general area of the dog park near the Trans Canada Trail, although this location is yet to be confirmed. Cost estimates for all three parks projects are contained in Appendix B.

7.2 DCC Calculations

Capital cost estimates for the t hree parks DCC projects are presented in Table 7 .1. For purposes of calculating t he DCC recoverable cost, the parks projects are assumed to be of general benefit. The percentage apporti oned to new development is the ratio of new development (218 population) to the horizon population (3,150) which is 6.9%.

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 7.2 - January 2022

Table 7.1: DCC Recoverable Costs for Parks

PARKS PROJECT

TOTAL

ESTIMATED

COST

PERCENT

DCC

RECOVERABLE

TOWN-

FUNDED

DCC

RECOVERABLE

Project P1: Trail - Swan Lake to Airport Trail Interconnection (700m length) $131,000 6.9% $121,961 $9,039 Project P2: Trail - Jacobson Road to Airport Trail Interconnection (500m length) $94,000 6.9% $87,514 $6,486 Project P3: Public Washroom near Dog Park $195,000 6.9% $181,545 $13,455 Total $28,980 Municipal Assist Factor (subtract) 1% DCC Recoverable Costs $28,690 Consistent with the Best Practices Guide, calculation of parks DCC’s is done on an equivalent population method based on persons per unit for various residential land uses as p resented in

Section 3.0. Consistent with the BPG, parks DCC’s are no t applicable to non- residential land

uses rec ognizing that these land uses do not create a demand for Parks. Parks DCC’s are calculated in Table 8.2 utilizing the equivalent population method. Table 7.2: Parks DCC Calculation

Part A – Equivalent Population Calculation

Land Use Est. New Development Equivalent Population Total Equivalent Population Low Density 86 units 2.1 180 Medium Density 8 units 2.0 16 High Density 15 units 1.5 22 Total Equivalent Population 218

Part B – Unit per Equivalent Population DCC

Net Parks DCC Program Recoverable (from Table 7.1) $28,690 (divided by) Total Equivalent Population 218 DCC per Equivalent Person $132

Part C – Parkland DCC’s on Per Unit Basis

Low Density Residential $132 x 2.1 $276 per unit Medium Density Residential $132 x 2.5 $263 per unit High Density Residential $132 x 1.5 $197 per unit

Town of Princeton-DCC Bylaw TRUE Consulting Technical Appendix - 8.1 - January 2022

SECTION 8.0 SUMMARY

As described in Section 2.0 , this technical support doc ument for the Town of Princeton Development Cost Charge Bylaw h as b een prepared on the basis of a revolving progr am approach with the tim e frame established as 10 years (to year 2031) . Consistent with Housing Needs st udies recently completed by the Town and the RDOS, the Town’ s population is projected to increase by 218 people by year 2031. New development is anticipated to comprise: Land Use % # Units Person/Unit Total Persons Low Density 83% 86 units 2.1 180 Medium Density 7% 8 units 2.0 16 High Density 10% 15 units 1.5 22 Total 218

Development Cost Charges are derived herein for:

Section 4.0 - Water Supply

Section 5.0 - Sanitary Sewers

Section 6.0 - Roads

Section 7.0 - Parkland

The following table summarizes DCCs with the assist factors included as presented in Section 2.3 of 1% for all infrastructure categories. Land Use Units Water Supply Sanitary Sewer Municipal Roads Parks Total Low Density dwelling unit $1,756 $6,231 $1,450 $276 $9,713 Medium Density dwelling unit $1,672 $5,934 $938 $263 $8,808 High Density dwelling unit $1,254 $4,451 $881 $197 $6,783 Commercial m² floor area $10.87 $38.57 $9.95 n/a $59.39 Industrial m² floor area $4.18 $14.84 $3.13 n/a $22.14 Institutional m² floor area $9.20 $32.64 $12.79 n/a $54.63

APPENDIX A

Plan of DCC Projects 028-693-36190113490028-693-36190113490 015-228-82790031506 013-936-56513459590013-936-56513459590

PROJECT W3: NEW WELL ATWATER SUPPLY WELL NO. 4 SITE

PROJECT W1: BROOKS BOOSTERSTATION REPLACEMENT

PROJECT W3: INDUSTRIAL AREAWATERMAIN UPGRADING

PROJECT S3A & S3B: SANITARYSEWER TRUNK MAIN UPGRADING

PROJECT S3C: SANITARY SEWERTRUNK MAIN UPGRADINGPROJECT S1: RELINING OFFENCHURCH FORCEMAINPROJECT S2: CULBERTSON LIFTSTATION REPLACEMENT

PROJECT P3: SUGGESTEDLOCATION OF PUBLIC WASHROOM

PROJECT S4: FENCHURCHLIFT STATION UPGRADES

PROJECT P2: TRAIL - JACOBSON ROAD TO AIRPORTTRAIL INTERCONNECTION (500m LENGTH)

WEST PLACETHE RIDGEWAYTULAMEEN TRAIL

RIDGEWOOD DRIVEEDGEWOOD DRIVEGROVE STREETEDGEWOOD DRIVEEDGEWOOD DRIVERIDGEWOOD DRIVEGLENVIEW CRESCENT MAYNE513-515

PRINCETON PLACEPANORAMA CRESCENTPRINCETON LANESAPPER STREETSAPPER LANEMOODY STREET

GRANT AVENUEBILLITER AVENUEPALMER STREETPARSONS AVENUE

MAYNE AVENUE

BILLITER AVENUE

HILLSIDE AVENUE

FENCHURCH AVENUE

SUNSET WEST

SUNSET EASTSUNSET AVENUE

DODD STREET

GRANITE STREET

ROCKLIN AVENUE

WARREN STREET

VERNON AVENUE

2ND STREET

ASPEN STREET #1CLARKSTREET

1ST STREET

PENRYN AVENUE3RD STREETVERMILION - WEST LANEVERMILION - EAST LANE

HALLIFORD AVENUE -WEST OF BRIDGE STREETTAPTON AVENUE - WESTOF BRIDGE STREET

BILLITER AVENUE - WESTOF BRIDGE STREETHAROLD AVENUE - WESTOF BRIDGE STREETANGELA AVENUE - WESTOF BRIDGE STREET

PUBLIC WORKS YARDACCESS ROAD

ANGELA AVENUE - EASTOF BRIDGE STREETHAROLD AVENUE - EASTOF BRIDGE STREETBILLITER AVENUE - EASTOF BRIDGE STREETFENCHURCH AVENUE -EAST OF BRIDGE STREETKENLEY AVENUEHALLIFORD AVENUE -EAST OF BRIDGE STREET

LIME STREET

THOMAS AVENUE

AUBURN CRESCENTSIMILKAMEEN AVENUEDOLLIE STREETSTOUT STREETGRANBY WAYBURTON AVENUE #1

BURTON AVENUE #2

PAVED LANEBARR STREET

WATERFRONT AVENUE

BURTON HIGHWAY ACCESSBURTON AVENUE #3 - EAST OFBURTON HIGHWAY ACCESS

ASPEN STREET #2ASPEN STREET #3BURTONCOURT

BRIDGE STREET

MOT LANE(ROCKLIN LANE)

SANDMAN FRONTAGE ROAD

DEWDNEY STREET

ALLISON AVENUE #1ALLISON AVENUE #2ALLISON AVENUE #3ASP STREETALLINPLACENECHIEFMAN STREETNECHIEFMANCRESCENTRIVERSIDE AVENUE

PINE STREETPOPLAR STREET

ANGELA AVENUE

LUARD AVENUEJOHNSONSTREET

LACHINE AVENUELAPWORTH STREETBRANDLMAYR GATE

CORINA AVENUEDEBLYN TRAILER PARK

WEST CHINA CREEK ROAD

COALMONT ROAD

BONLIN ROADDEERVIEW CRESCENT

INGERBELLE AVENUEBILL MINOR WAY

WEST CHINA CREEK ROAD

CEMENT STREET8TH AVENUEPRINCETON STREET

7TH AVENUE

9TH AVENUE

PORTLAND STREET

OLD HEDLEY ROAD

TULAMEEN AVENUE #1

TULAMEEN AVENUE #2

TULAMEEN AVENUE #3TULAMEEN AVENUE #4

OLD MERRITT HIGHWAY

AIRPORT ROAD #1

AIRPORT BRANCHOLD BRIDGE ROAD

AIRPORT ROAD #2

JACOBSON ROAD #1

JACOBSON ROAD #2

PRINCETON-SUMMERLAND ROAD

CULBERTSON WAYSANDERSON WAYEAGLE CRESCENTSWIMMING POOL DRIVE

COPPER MOUNTAIN ROADMACLEOD WAY

GRANITE PRV

BILLITER BOOSTER STATION

LIONS PARK BOOSTER STATION

FENCHURCH LIFT STATION

PRINCETON PLACE BOOSTER STATIONMAYNE AVENUE CHECK VALVE CHAMBER

EAST PRINCETON PRVVALVE SETTING 60 psi NORTH RESERVOIRFWL: 702.25 mCAPACITY: 2,280 m³ SHOP PRVVALVE SETTING 79psi

TULAMEEN WATERSUPPLY WELL NO. 4

WEST RESERVOIRFWL:723 mCAPACITY: 940 m³

CULBERTSON LIFT STATION

BROOKS BOOSTERSTATION

EXISTING HDPE FORCEMAIN

PROJECT R1: CORINA AVENUEWIDENING (SCHOOL TO LAPWORTH)

PROJECT R2: JACOBSON ROAD RECONSTRUCTION(OLD MERRITT HIGHWAY TO WATERMAIN R/W)

PROJECT R3: GRANBY WAYWIDENING (BARR TO STOUT)

MEMORIAL PARK WATERSUPPLY WELL NO. 1MEMORIAL PARK WATERSUPPLY WELL NO. 2

SEWER SIPHON

ANGELA AVENUESEWER CROSSING

SANITARY SEWER PROJECTWATER SUPPLY PROJECTMUNICIPAL ROADS PROJECTTRAIL (LINEAR PARK) PROJECTPARK PROJECTEXISTING PARK (NOT INCLUDING RIPARIANAREA OR TRANS CANADA TRAILPOTENTIAL FUTURE DEVELOPMENTAREAS

LEGEND

WESTRIDGE COURTWESTRIDGE DRIVE

COPPER MOUNTAIN BAR& GRILL ACCESS ROAD

WESTRIDGE KLARGESTER RBCBROOKS RESERVOIRFWL:770 mCAPACITY: 500 m³

PROJECT W3: INDUSTRIAL AREAWATERMAIN UPGRADING

PROJECT P1: TRAIL - SWAN LAKE TO AIRPORTTRAIL INTERCONNECTION (700m LENGTH)LAURIE CURRIE WAY #1LAURIE CURRIE WAY #2

PRINCETON-SUMMERLAND ROAD

AIRPORT ROAD #1OLD MERRITT HIGHWAYAIRFIELD RESERVOIRFWL: 755.15 mCAPACITY: 1,500 m³ PROJECT R4: LAURIE CURRIE WAY SURFACING(HIGHWAY 5A TO PRINCETON-SUMMERLAND ROAD)201 - 2079 Falcon Road ■ Kamloops BC ■ V2C 4J2tel 250.828.0881 ■ fax 250.828.0717info@TRUE.bc.ca FILE: r:\clients\400-499\465\465-621\03 drawings\cad\02 design drawings\dn-465-621

CONSULTANT SEAL

SCALE DRAWING No.

ISSUES / REVISIONS

PROJECT REFERENCE No.DATEDRAWN BYDESIGN BY DATENo.DESCRIPTIONAPP'DBY

SHEETISSUE/REV.

####DCC BYLAWTECHNICALAPPENDIXDCC PROJECTS1:5,000SACSACSEPTEMBER 2021465-011, 465-151, 465-161, 465-511, 465-591465-621-011OF13

0SEPT22/21DRAFT REPORT FIGURESACSAC

INSET A

INSET B

REFER TOINSET A

REFER TOINSET BHALFSCALE

MUNICIPAL BOUNDARY

MUNICIPAL BOUNDARY

SWAN LAKE AREA

MUNICIPAL BOUNDARY

MUNICIPAL BOUNDARY

MUNICIPAL BOUNDARYSIMILKAMEEN RIVER

SIMILKAMEEN RIVERTULAMEEN RIVER

TULAMEEN RIVER

TULAMEEN RIVER

HIGHWAY 3

HIGHWAY 5A

HIGHWAY 3

HIGHWAY 3

HIGHWAY 3

HIGHWAY 5A

EXISTING WATERMAINEXISTING SEWER MAINEXISTING STORM MAIN

1OCT08/21FINAL REPORT FIGURESACSAC

* ROAD NAMES ARE CONSISTENT WITHROAD CONDITION REPORT

SIMILKAMEEN RIVER

WASTEWATER LAGOONS

2OCT29/21FINAL REPORT FIGUREREVISED PER GOVERNMENT COMMENTSSACSAC3JAN25/22FINAL REPORT FIGURECORRINA UPDATED TO CORINASACSAC

APPENDIX B

Development Cost Charge Project Capital Cost Estimates Water Supply • Brooks Booster Station Replacement • Billiter / Warren Booster Station Replacement • New Well at Water Supply Well No. 4 Site • Industrial Area Watermain Upgrading Sanitary Sewer • Relining of Fenchurch Forcemain • Culbertson Lift Station Replacement • Sanitary Sewer Trunk Main Upgrading • Fenchurch Lift Station Upgrades Roads • Corina Avenue Widening (School to Lapworth) • Jacobson Road Reconstruction (Old Merritt High way to Watermain R/W) • Granby Way Widening (Barr to Stout) • Laurie Currie Way Sur facing (Highway 5A to Princeton -Summerland Road) • Airport Road Widening (Old Merritt Highway to Town Boundary) Parks • Trail - Swan Lake to Airport Trail Interconnection (700m length) • Trail - Jacobson Road to Airport Trail Interconnection (500m length) • Public Washroom near Dog Park

465-621 25-Jan-22 Page 1

ITEM UNIT OF EST. UNIT TOTAL

NO. DESCRIPTION MEASURE. QUANT. PRICE PRICE

Project W1: Brooks Booster Station Replacement

1.0 Booster Station

1.1 Fence removal, excavation and foundation preparation L.S. 1 $6,000 $6,000.00

1.2 Foundation and floor slab L.S. 1 $50,000 $50,000.00

1.3 Floor drainage L.S. 1 $5,000 $5,000.00

1.4 Core holes in reservoir wall, supply and install pump cans – 3 ea. L.S. 1 $40,000 $40,000.00

1.5 Building, precast concrete including roof m² 30 $2,000 $60,000.00

1.6 Building appurtenances including door, hatches, ventilation L.S. 1 $20,000 $20,000.00

1.7 Supply and install pumps – 2 each c/w VFDs L.S. 1 $60,000 $60,000.00

1.8 Discharge piping L.S. 1 $50,000 $50,000.00

1.9 Electrical and MCC L.S. 1 $75,000 $75,000.00

1.10 PLC and SCADA programming Allow 1 $50,000 $50,000.00

1.11 Building electrical, heating, lighting, etc. L.S. 1 $20,000 $20,000.00

2.0 Site Works

2.1 250mm water supply main

- Hot tap connection complete with gate valve L.S. 1 $12,000 $12,000.00 - 250mm PVC watermain l.m. 40 $350 $14,000.00 - 250mm fittings ea. 5 $3,000 $15,000.00

2.2 Disconnect piping to and from the existing booster station

- Cap existing 150mm suction piping to the existing booster station L.S. 1 $5,000 $5,000.00 - Remove existing discharge piping in the valve chamber L.S. 1 $5,000 $5,000.00 - Extend 150mm piping at check valve chamber to function as a reservoir drain Allow 1 $8,000 $8,000.00

2.3 Electrical service upgrade Allow 1 $25,000 $25,000.00

2.4 Access road to booster station

- Grading of access road to the booster station including construction of turnaround L.S. 1 $7,500 $7,500.00 - Perimeter fence alignment around proposed vehicle turnaround L.S. 1 $5,000 $5,000.00

2.5 Decommission existing booster station Allow 1 $10,000 $10,000.00

Subtotal Project W1 $542,500.00 Engineering (15%) $81,375.00 Contingency (25%) $135,625.00 Total Project W1 $760,000.00 Project W2: New Well at Water Supply Well No. 4 Site

1.1 Drilling and development of new well capable of 600 to 900 Usgpm

capacity range at Well No. 4 site including pump test. L.S. 1 $110,000 $110,000.00

1.2 Hydrogeological consultant for well design, supervision and

completion report. L.S. 1 $40,000 $40,000.00

1.3 Supply and install pitless adapter complete with welding to well casing

and bentonite seal to 2m below surface including site fill and access road. L.S. 1 $30,000 $30,000.00

1.4 Supply and install submersible pump, check valve, gate valve, and

ultrasonic level transducer. L.S. 1 $45,000 $45,000.00

1.5 Post mounted electrical disconnect at well. L.S. 1 $10,000 $10,000.00

1.6 Supply and install 200mm dia. DR18 C900 PVC from pitless adapter

to Well No. 4 building complete with fill as required. l.m. 105 $225 $23,625.00

1.7 Supply and install power and telecommunication cable in 75mm dia.

RPVC conduit in common trench with watermain complete with junction boxes as necessary. l.m. 150 $100 $15,000.00

1.8 Supply and install building extension on western wall of Well No. 4

building complete with foundation and electrical components including heater, light and thermostat. L.S. 1 $80,000 $80,000.00

1.9 Mechanical steel piping, flow meter, air release, reducer, chlorine

injection, and connection to existing chlorine contact chamber. L.S. 1 $30,000 $30,000.00 Town of Princeton DCC Bylaw DCC Recoverable Project Cost Estimates - Water Supply

Town of Princeton 465-621 DCC Recoverable Project Cost Estimates 25-Jan-22 Page 2

1.10 Water system upgrades at West Reservoir to allow for increased

chlorine contact time between Well No. 4 well site and initial consumers. L.S. 1 $50,000 $50,000.00

1.11 Electrical including VFD, wiring, pump control panel, etc. L.S. 1 $75,000 $75,000.00

1.12 Upgrade chlorination system to include chemical feed pump and

solution tubing to kiosk. L.S. 1 $15,000 $15,000.00

1.13 Pump Control and SCADA Programming Allow 1 $20,000 $20,000.00

Subtotal Project W2 $543,625.00 Engineering (15%) $81,543.75 Contingency (25%) $135,906.25 Total Project W2 $762,000.00 Project W3: Industrial Area Watermain Upgrading

1.0 Watermain tie-ins

1.1 On Laurie Currie Road L.S. 1 $10,000 $10,000.00

1.2 On David Browne Way L.S. 1 $10,000 $10,000.00

2.0 Supply and install 300mm PVC watermain l.m. 1400 $375 $525,000.00

3.0 Watermain fittings Allow 1 $75,000 $75,000.00

4.0 Restorations (including pavement and gravels)

4.1 Road restorations (including pavement and gravels) m² 200 $75 $15,000.00

4.2 Boulevard restorations m² 6500 $10 $65,000.00

Subtotal Project W3 $700,000.00 Engineering (15%) $105,000.00 Contingency (25%) $175,000.00 Total Project W3 $980,000.00 Project W1: Brooks Booster Station Replacement $760,000.00 Project W2: New Well at Water Supply Well No. 4 Site $762,000.00 Project W3: Industrial Area Watermain Upgrading $980,000.00 465-621 25-Jan-22 Page 1

ITEM UNIT OF EST. UNIT TOTAL

NO. DESCRIPTION MEASURE. QUANT. PRICE PRICE

Project S1: Relining of Fenchurch Forcemain

1.1 Relining of existing 250mm diameter cast iron forcemain l.m. 900 $500 $450,000.00

1.2 Air release valve L.S. 1 $7,500 $7,500.00

1.3 Tie-ins on extents of project ea. 2 $10,000 $20,000.00

1.4 Allowance for dewatering at lift station tie-in L.S. 1 $20,000 $20,000.00

1.5 Allowance for environmental mitigation in riparian excavation areas L.S. 1 $20,000 $20,000.00

Subtotal Project S1 $517,500.00 Engineering (15%) $77,625.00 Contingency (25%) $129,375.00 Total Project S1 $725,000.00 Project S2: Culbertson Lift Station Replacement

1.0 Lift Station

1.1 Excavation and slab preparation L.S. 1 $20,000 $20,000.00

1.2 FRP lift station L.S. 1 $250,000 $250,000.00

1.3 Valve chamber L.S. 1 $50,000 $50,000.00

1.4 Interconnecting piping L.S. 1 $35,000 $35,000.00

1.5 Lift station and valve chamber electrical commissioning - utilize

existing electrical kiosk L.S. 1 $20,000 $20,000.00

2.0 Site Works

2.1 100mm forcemain

- 100mm PVC forcemain l.m. 40 $250 $10,000.00 - 100mm fittings ea. 5 $2,000 $10,000.00

2.2 Tie-into existing sanitary manhole with new gravity main L.S. 1 $15,000 $15,000.00

2.3 Tie to existing AC forcemain L.S. 1 $10,000 $10,000.00

2.4 Blow-off Assembly c/w water servicing tubing ea. 1 $7,500 $7,500.00

2.5 Disconnect piping to and from the existing lift station L.S. 1 $10,000 $10,000.00

2.6 Dismantle and dispose of existing lift station L.S. 1 $20,000 $20,000.00

2.7 Pavement restoration m² 150 $75 $11,250.00

2.8 Landscaping restoration Allow 1 $10,000 $10,000.00

2.9 Interconnecting electrical conduit and wiring from existing electrical

kiosk to proposed works Allow 1 $10,000 $10,000.00 Subtotal Project S2 $488,750.00 Engineering (15%) $73,312.50 Contingency (25%) $122,187.50 Total Project S2 $685,000.00 Project S3: Sanitary Sewer Trunk Main Upgrading

Part S3A: Riverside Avenue (west of Poplar Street) - MH77A to 77

1.0 Sewer System

1.1 450mm diameter sewer main l.m. 45 $350 $15,750.00

1.2 Manholes (complete) ea. 2 $7,500 $15,000.00

1.3 Sewer services (wye, sweep, inspection chamber, piping) - assume 12

per block ea. 1 $4,000 $4,000.00

1.4 Provide bypass system for service continuation L.S. 1 $15,000 $15,000.00

2.0 Drainage

2.1 Allowance for drainage improvements L.S. 1 $15,000 $15,000.00

3.0 Roads

3.1 Asphalt removal m² 280 $10 $2,800.00

3.2 Concrete removal m² 90 $20 $1,800.00

3.3 Base preparation m² 370 $10 $3,700.00

3.4 Edge preparation of tie-ins m² 120 $20 $2,400.00

3.5 Road base m² 370 $30 $11,100.00

3.6 Asphalt surface (allow 65mm compacted thickness) m² 280 $45 $12,600.00

3.7 Curb & gutter m² 45 $130 $5,850.00

Town of Princeton DCC Bylaw DCC Recoverable Project Cost Estimates - Sanitary Sewer

Town of Princeton 465-621 DCC Recoverable Project Cost Estimates 25-Jan-22 Page 2

ITEM UNIT OF EST. UNIT TOTAL

NO. DESCRIPTION MEASURE. QUANT. PRICE PRICE

Project S3: Sanitary Sewer Trunk Main Deficiency Upgrades (cont.)

3.8 Sidewalk - 1.5m width m² 67.5 $110 $7,425.00

3.9 Traffic markings

- Yellow Centreline m² 45 $10 $450.00 - White lane edge m² 45 $10 $450.00 Subtotal Project S3 - Part A $113,325.00 Engineering (15%) $16,998.75 Contingency (25%) $28,331.25 Total Project S3 - Part A $159,000.00

Part S3B: Poplar Street (Lachine to Allison Avenue) MH 74 to 71

1.0 Sewer System

1.1 450mm diameter sewer main l.m. 85 $350 $29,750.00

1.2 Manholes (complete) ea. 2 $7,500 $15,000.00

1.3 Sewer services (wye, sweep, inspection chamber, piping) - assume 12

per block ea. 2 $4,000 $8,000.00

1.4 Provide bypass system for service continuation L.S. 1 $15,000 $15,000.00

2.0 Drainage

2.1 Allowance for drainage improvements L.S. 1 $15,000 $15,000.00

3.0 Roads

3.1 Asphalt removal m² 450 $10 $4,500.00

3.2 Concrete removal m² 170 $20 $3,400.00

3.3 Base preparation m² 620 $10 $6,200.00

3.4 Edge preparation of tie-ins m² 160 $20 $3,200.00

3.5 Road base m² 620 $30 $18,600.00

3.6 Asphalt surface (allow 65mm compacted thickness) m² 450 $45 $20,250.00

3.7 Curb & gutter m² 85 $130 $11,050.00

3.8 Sidewalk - 1.5m width m² 127.5 $110 $14,025.00

3.9 Traffic markings

- Yellow Centreline m² 85 $10 $850.00 - White lane edge m² 85 $10 $850.00 Subtotal Project S3 - Part B $165,675.00 Engineering (15%) $24,851.25 Contingency (25%) $41,418.75 Total Project S3 - Part B $232,000.00

Part S3C: Lime Street (Angela Avenue to Harold Avenue) MH55 to 51

1.0 Sewer System

1.1 450mm diameter sewer main l.m. 80 $350 $28,000.00

1.2 Manholes (complete) ea. 2 $7,500 $15,000.00

1.3 Sewer services (wye, sweep, inspection chamber, piping) - assume 12

per block ea. 1 $4,000 $4,000.00

1.4 Provide bypass system for service continuation L.S. 1 $15,000 $15,000.00

2.0 Drainage

2.1 Allowance for drainage improvements L.S. 1 $15,000 $15,000.00

3.0 Roads

3.1 Asphalt removal m² 420 $10 $4,200.00

3.2 Concrete removal m² 160 $20 $3,200.00

3.3 Base preparation m² 580 $10 $5,800.00

3.4 Edge preparation of tie-ins m² 160 $20 $3,200.00

3.5 Road base m² 580 $30 $17,400.00

3.6 Asphalt surface (allow 65mm compacted thickness) m² 420 $45 $18,900.00

3.7 Curb & gutter m² 80 $130 $10,400.00

3.8 Sidewalk - 1.5m width m² 120 $110 $13,200.00

3.9 Traffic markings

- Yellow Centreline m² 80 $10 $800.00 - White lane edge m² 80 $10 $800.00 Subtotal Project S3 - Part C $154,900.00 Engineering (15%) $23,235.00 Contingency (25%) $38,725.00 Total Project S3 - Part C $217,000.00 Total Project S3 - Parts A, B, C $608,000.00 Town of Princeton 465-621 DCC Recoverable Project Cost Estimates 25-Jan-22 Page 3

ITEM UNIT OF EST. UNIT TOTAL

NO. DESCRIPTION MEASURE. QUANT. PRICE PRICE

Project S4: Fenchurch Lift Station Electrical Upgrades

1.1 Electrical Design - Engineering L.S. 1 $13,400 $13,400.00

1.2 Electrical Service Upgrade L.S. 1 $30,000 $30,000.00

1.3 Kiosk L.S. 1 $113,100 $113,100.00

1.4 Generator L.S. 1 $54,200 $54,200.00

1.5 Radio Mast L.S. 1 $800 $800.00

1.6 Power/Feeder Cabling (and Conduits) L.S. 1 $18,300 $18,300.00

1.7 Instrument Cabling (and Conduits) L.S. 1 $5,100 $5,100.00

1.8 Site Electrical (Intrusion Switches) L.S. 1 $1,000 $1,000.00

1.9 Demolition, Installation and Commissioning Labour hours 160 $200 $32,000.00

1.10 Electrical Permit L.S. 1 $3,100 $3,100.00

1.11 Programming Updates and IO Checks hours 16 $135 $2,160.00

1.12 Trenching, backfilling, and concrete pads L.S. 1 $20,000 $20,000.00

Subtotal Project S4 $293,160.00 Project Management/Mobilization/Demobilization (10%) $29,316.00 Contingency (30%) $87,948.00 Total Project S4 $411,000.00 Project S1: Relining of Fenchurch Forcemain $725,000.00 Project S2: Culbertson Lift Station Replacement $685,000.00 Project S3: Sanitary Sewer Trunk Main Upgrading $608,000.00 Project S4: Fenchurch Lift Station Electrical Upgrades $411,000.00 465-621 25-Jan-22 Page 1

ITEM UNIT OF EST. UNIT TOTAL

NO. DESCRIPTION MEASURE. QUANT. PRICE PRICE

Project R1: Corina Avenue Widening (School to Lapworth) 1.0

1.1 Strip and clear 6m width m² 4200 $5.00 $21,000.00

2.0 Road Structure

2.1 Sawcut and prep existing pavement edge l.m. 700 $10.00 $7,000.00

2.2 Asphalt widening c/w grading, subbase, gravels, and final adjustments

of appurtenances m² 2100 $70.00 $147,000.00

2.3 Curb and Gutter (one side) l.m. 735 $125.00 $91,875.00

2.4 Sidewalk l.m. 735 $115.00 $84,525.00

2.5 Road Markings l.m. 700 $20.00 $14,000.00

3.0 Stormwater

3.1 Dry well assembly c/w catch basins and leads at 75m spacing l.m. 9 $15,000.00 $135,000.00

4.0 Miscellaneous

4.1 Boulevard grading and seeding m² 1400 $20.00 $28,000.00

Subtotal Project R1 $528,400.00 Engineering (15%) $79,260.00 Contingency (25%) $132,100.00 Total Project R1 $740,000.00 Project R2: Jacobson Road Reconstruction (Old Merritt Highway to Watermain R/W) 1.0

1.1 Strip and clear 12m width m² 6000 $5.00 $30,000.00

2.0 Road Structure

2.1 Sawcut and prep existing pavement edge l.m. 15 $10.00 $150.00

2.2 Asphalt c/w grading, subbase, gravels, and final adjustments of

appurtenances m² 4000 $70.00 $280,000.00

2.3 Curb and Gutter (both sides) l.m. 1000 $125.00 $125,000.00

2.4 Sidewalk (one side) l.m. 525 $115.00 $60,375.00

2.5 Road Markings l.m. 500 $20.00 $10,000.00

3.0 Stormwater

3.1 Dry well assembly c/w catch basins and leads at 75m spacing l.m. 7 $15,000.00 $105,000.00

4.0 Miscellaneous

4.1 Boulevard grading and seeding m² 1500 $20.00 $30,000.00

Subtotal Project R2 $640,525.00 Engineering (15%) $96,078.75 Contingency (25%) $160,131.25 Total Project R2 $897,000.00 Project R3: Granby Way Widening (Barr to Stout) 1.0

1.1 Strip and clear 6m width m² 1500 $5.00 $7,500.00

2.0 Road Structure

2.1 Sawcut and prep existing pavement edge l.m. 250 $10.00 $2,500.00

2.2 Asphalt widening c/w grading, subbase, gravels, and final adjustments

of appurtenances m² 750 $70.00 $52,500.00

2.3 Curb and Gutter (one side) l.m. 262.5 $125.00 $32,812.50

2.4 Sidewalk (one side) l.m. 262.5 $115.00 $30,187.50

2.5 Road Markings l.m. 250 $20.00 $5,000.00

Earthworks Town of Princeton DCC Bylaw Update DCC Recoverable Project Cost Estimates - Municipal Roads Earthworks Earthworks

Town of Princeton 465-621 DCC Recoverable Project Cost Estimates 25-Jan-22 Page 2 Project R3: Granby Way Widening (Barr to Stout) (cont.)

3.0 Stormwater

3.1 Dry well assembly c/w catch basins and leads at 75m spacing l.m. 3 $15,000.00 $45,000.00

4.0 Miscellaneous

4.1 Boulevard grading and seeding m² 500 $20.00 $10,000.00

Subtotal Project R3 $185,500.00 Engineering (15%) $27,825.00 Contingency (25%) $46,375.00 Total Project R3 $260,000.00 Project R4: Laurie Currie Way Surfacing (Highway 5A to Princeton-Summerland Road) 1.0

1.1 Prep existing gravel surface m² 11280 $5.00 $56,400.00

2.0 Road Structure

2.1 Sawcut and prep existing pavement edge l.m. 30 $10.00 $300.00

2.2 Asphalt c/w grading, subbase, gravels, and final adjustments of

appurtenances m² 9400 $40.00 $376,000.00

2.3 Road Markings l.m. 940 $20.00 $18,800.00

3.0 Stormwater

3.1 Allowance for culverts Allow $30,000.00

3.1 Drainage ditches l.m. 1880 $30.00 $56,400.00

4.0 Miscellaneous

4.1 Boulevard grading and seeding m² 3760 $20.00 $75,200.00

Subtotal Project R4 $613,100.00 Engineering (15%) $91,965.00 Contingency (25%) $153,275.00 Total Project R4 $858,000.00 Project R1: Corina Avenue Widening (School to Lapworth) $740,000.00 Project R2: Jacobson Road Reconstruction (Old Merritt Highway to Watermain R/W) $897,000.00 Project R3: Granby Way Widening (Barr to Stout) $260,000.00 Project R4: Laurie Currie Way Surfacing (Highway 5A to Princeton-Summerland Road) $858,000.00 Earthworks 306-1811 25-Jan-22 Page 1

ITEM UNIT OF EST. UNIT TOTAL

NO. DESCRIPTION MEASURE. QUANT. PRICE PRICE

Project P1: Trail - Swan Lake to Airport Trail Interconnection (700m length) 1.0

1.1 Strip and clear 4m width m² 2800 $5.00 $14,000.00

2.0 Pathway

2.1 Gravel pathway - crushed gravel surfacing (3.0m width) m² 2100 $30.00 $63,000.00

3.0 Miscellaneous

3.1 Boulevard grading and seeding m² 1400 $20.00 $28,000.00

Subtotal Project P1 $105,000.00 Engineering (10%) $10,500.00 Contingency (15%) $15,750.00 Total Project P1 $131,000.00 Project P2: Trail - Jacobson Road to Airport Trail Interconnection (500m length) 1.0

1.1 Strip and clear 4m width m² 2000 $5.00 $10,000.00

2.0 Pathway

2.1 Gravel pathway - crushed gravel surfacing (3.0m width) m² 1500 $30.00 $45,000.00

3.0 Miscellaneous

3.1 Boulevard grading and seeding m² 1000 $20.00 $20,000.00

Subtotal Project P2 $75,000.00 Engineering (10%) $7,500.00 Contingency (15%) $11,250.00 Total Project P2 $94,000.00 Project P3: Public Washroom near Dog Park 1.0

1.1 Foundation excavation and under slab backfill Allow $7,000.00

2.0 General Construction

2.1 Foundation and floor slab concrete m³ 15 $1,500.00 $22,500.00

2.2 Building including roof, doors, etc. m³ 20 $3,500.00 $70,000.00

2.3 Plumbing fixtures Allow $10,000.00

2.4 Electrical including service Allow $15,000.00

2.5 Sewer and water service Allow $15,000.00

Subtotal Project P3 $139,500.00 Engineering (15%) $20,925.00 Contingency (25%) $34,875.00 Total Project P3 $195,000.00 Project P1: Trail - Swan Lake to Airport Trail Interconnection (700m length) $131,000.00 Project P2: Trail - Jacobson Road to Airport Trail Interconnection (500m length) $94,000.00 Project P3: Public Washroom near Dog Park $195,000.00 Town of Princeton DCC Bylaw Update DCC Recoverable Project Cost Estimates - Parks Removals Removals Earthworks

Sources

  1. 465-621-Princeton-DCC-Bylaw-Technical Appendix-R3-January 2022

Generated 2026-09-20T01:12:39.480641+00:00 · model fallback